backhoe.gif (2207 bytes)

Current Projects

Route 117 Bridge

Granville Road Bridge 

Elm St Bridge Replacement

Project Scope of Work
Johnson Street Bridge Replacement over MBTA - Peabody, MA
$1,566,723
Bridges (2) demolition and reconstruction over MBTA railroad, temporary pedestrian bridge, steel sheeting with box beam deck.
Route 117 Bridge Replacement over the Sudbury River - Concord/Lincoln, MA
$6,426,428
Temporary bridge and roadway construction, cofferdams, demolition of existing bridge, construction of new bridge - historical granite replication, cast in place 2 span arch structure on pipe piles
Granville Road Bridge Replacement over the Little River
Westfield, MA

$2,777,586 
Bridge demolition and replacement, cofferdams, caisson foundation, precast arch structure (3 span) with precast spandrel walls and precast approach walls.
Elm Street Bridge Replacement over Amtrak
Mansfield, MA

$2,347,816 
Bridge demolition and replacement, caisson foundation with structural steel beams and concrete deck, over MBTA "Acela" Line.
Box Culvert Replacement-Labor Only under AMTRAK Commuter Rail
Winchester, MA
$125,000
Emergency track shutdown. 24 hour per day work shift for one weekend- Track reinstallation for Monday commuter lines.
Route 100 over Manhan River
South Hampton, MA
$1,476,979
Two phase bridge DEMO/RECON.  Steel sheeting support system, 36" Caisson Foundation w/Precast Bulb Tee Beams and cast in place bridge deck.