Completed Projects

 
South Ferry Road and Meadow Brook Road Bridge replacements over the Sawmill River Montague, MA


Hovey Road Bridge Replacement
over Conrail Monson, MA


Murphy Road Bridge Replacement
over Susquetonscut Brook
Franklin, CT


North Main Street Bridge Replacement over the Hockanum River
Manchester, CT 

 Route 38 (Main Street) Bridge Replacement Over the Shawsheen River
Route 38 (Main Street) Bridge Replacement Over the Shawsheen River
Tewksbury, MA

Depot Street Bridge Reconstruction over Dwite Canal - Chicopee, MA
Depot Street Bridge Reconstruction
Over Dwight Canal
Chicopee, MA

Bodycote Factory Reconstruction Andover, MA
Project Scope of Work
Bullards Crossing Road Bridge Demolition
Hinsdale, MA
$122,255 
Bridge demolition over CSX railroad and site restoration.
Replacement of Culvert at Point Grove Road over Congamond Lake
Southwick, MA
$786,174 
Box culvert (14' X 12') removal and replacement, pond dredging, water main and drainage improvements.
Bridge Joint Repairs At Various Locations
District 5, MA
$1,335,979 
Removal of existing bridge joints and replace with asphaltic plug joints, along with substructure rehabilitation.
River Street Bridge Replacement over the Concord River
Billerica, MA
$2,346,163 
Bridge demolition/reconstruction with concrete and steel pile foundation, structural steel, superstructure with cast in place deck, extensive water and sewer construction.
Replacement of Concrete Median Barrier on a Section of Route 2
Lexington/Lincoln, MA
$1,582,640 
Removal and replacement of 11,000 linear feet of concrete barrier with tall wall barrier.

South Ferry Road and Meadow Brook Road Bridge Replacements over the Sawmill River
Montague, MA

$1,290,981 
Removal and replacement of two bridges, H-pile foundation cofferdams, tremie seal cast-in-place bridge decks.
Hovey Road Bridge Replacement over Conrail
Monson, MA

$1,297,432 
Temporary bridge removal, salvage bridge reconstruction roadway reconstruction.
Holland Road Bridge Deck Rehabilitation over the Quinnebaug River and Champeaux Rd Bridge Pier Rehabilitation over Long Pond
Sturbridge, MA
$126,644
Bridge deck rehabilitation and timber pier replacement.



High Street Bridge Replacement over Bay Colony Railroad
Taunton, MA
$1,096,564
Bridge demolition and reconstruction, 48" caissons/piers, H-pile foundation.
Crane Avenue Bridge Replacement over the Three Mile River
Norton, MA
$767,832
Bridge demolition, precast concrete arch bridge, steel sheeted scour walls left-in-place, concrete retaining walls.
North Main Street Bridge Replacement over the Hockanum River
Manchester, CT

$1,884,500
Temporary vehicular bridge, bridge demolition and reconstruction with concrete arch, steel sheeted cofferdams, contaminated soil disposal, water and sewer reconstruction.
Bridge Deck Repairs and Joint Modifications on I-290
Auburn, MA
$2,537,087
Bridge decks (2) partial removal/replacement, cold plane and paving, drainage structure repairs, traffic control, asphalt plug joints.
Deck Repairs and Paving, Bourne and Sagamore Bridges
Bourne, MA
$3,427,459
Bridge repairs, armor joint replacement, membrane waterproof, paving, traffic control, electrical lighting.
Valley Road Bridge Replacement over Whetstone Brook
Killingly, CT
$902,038
Bridge demolition and reconstruction, steel sheeted cofferdams, H-Pile foundation, roadway reconstruction - two phases.
Route 163 Bridge Replacement over the Oxoboxo River
Montville, CT
$1,120,933
Bridge demolition and reconstruction, cofferdams, steel sheeting, control of water, box culverts, bridge structure = triple 10' x 8'.
Murphy Road Bridge Replacement over Susquetonscut Brook
Franklin, CT
$886,565
Bridge demolition and reconstruction, steel sheeted cofferdams, H-pile foundation, roadway reconstruction.

Ingell Street Bridge Replacement over Mill River
Taunton, MA
$992,079
Temporary vehicular bridge and bridge demolition / replacement, steel H-pile foundation, cofferdams, control of water.
Route 12 Bridge Replacement at Whetstone Brook
Killingly, CT
$1,227,890
Temporary vehicular bridge and bridge demolition/replacement with precast arch bridge on caissons, steel sheeted cofferdams and control of water.
Route 3 Reconstruction @ Route 62 Off-ramp
Bedford, MA
$263,000
Highway ramp retaining wall, concrete and rebar only.
West Center Street Bridge Replacement over the Quinnipiac River
Southington, CT
$1,111,000
Bridge demolition and reconstruction with H-pile foundation and box beam deck, water, sewer and drain relocation.
Ellis Pond Dam Reconstruction
Norwood, MA

$747,088
Dam reconstruction within steel sheeted cofferdam, concrete spillway & overflow. Demolish and reconstruct control of dam flows.
Bridge Replacement - Boylston Street,
Over the B&M Railroad Lowell, MA

$ 1,146,397
Bridge demo/recon over railroad, steel sheeting, rock drilled steel piles, concrete work, road reconstruction.
Bridge Replacement - Route 202 (Elm St), Over Otter River
Templeton, MA
$1,067,637
Bridge demo/recon (two phase) maintaining traffic, drilled steel piles, support of excavation concrete work and road, utility recon.
Bridge Replacement - Dedham Street, Over Neponset River
Canton - Norwood - Westwood, MA
$887,813
Bridge demo/recon (two phase) maintaining traffic, steel H-piles support of excavation, concrete work and road recon.
Bridge Replacement Including Signals-South Street, Over B&M Railroad
Ware, MA
$1,237,375
Bridge demo/recon (two phase) maintaining traffic, rocksocket caissons, support of excavation, concrete work and road/utility recon.
Rehabilitation of Bridge Drainage Systems Along I-290 
Millbury/Worcester, MA
$ 107,200
Bridge drainage repairs and maintenance work.
Bridge Replacement - Route 128
Over MBTA Gloucester, MA
$ 777,767
Bridge deck demo/recon (three phase), maintaining traffic, roadway recon.
Bridge Replacement - Wendell Depot
Over the Miller River Orange/Wendell, MA
$2,130,000
Bridge Demo/Reconstruction
48" Caissons Foundation,  Control of Water
Steel Sheeting and H-Piles, concrete and structural steel work, roadway recon
Building Reconstruction
155 River St.
Andover, MA

$583,366
Steel sheeted cofferdam 40 foot deep inside building, tiebacks, two level whale system.  Concrete (1200cy), rebar (120 ton), waterproofing (900 sy).
Seawall Rehabilitation
Oceanside Drive
Situate, MA
$1,137,565

 

Ocean revetment reconstruction (1200 lf). Concrete seawall removal, rehabilitation and replacement   (1200 cy). 30" diameter concrete encased outfall reconstruction with pipe pile foundation.   Armor stone (5-8 ton) installation with core stone (3 1/2-5 ton) and bedding stone (6"-18").
Bridge Replacement – Chapin Road Over the Assabet River
Hudson, MA

$844,445
BridgeDemo/Reconstruction 3 Structures, Steel Sheeted Cofferdams, H-Pile Foundation.
Morgan Street
South Hadley, MA
$303, 837
18' Arch culvert demolition and replacement with 10' x 8' precast culvert. Control of existing river flows, water main reconstruction.
Rt 495 Bridge Rehab Various Location
District 3, MA
$1,547,875
Substructure and joint rehabilitation on various bridges along I-495.
Depot Street Bridge Reconstruction
Over Dwight Canal
Chicopee, MA

$1,257,458
Bridge Demo/Reconstruction. Temporary Vehicular Bridge both over canal. steel - sheeted support of excavation, utilities - temporary and permanent.
Prospect Street Bridge Reconstruction
Over Hop Brook
Manchester, CT
$920,610
Bridge demo/reconstruction over hop brook, temporary pedestrian bridge, control of water, sewer and road reconstruction.
Route 38 (Main Street) Bridge Replacement Over the Shawsheen River
Tewksbury, MA

$814,649
Bridge Demo/Reconstruction 2 phases over Shawsheen River, temporary pedestrian bridge, pipe pile foundation.
Cadwell Road Bridge over
Southwest Branch of
Housatonic River Pittsfield, MA
$394,587
Bridge demo, box culvert reconstruction in river, control of water, steel sheeting.
Woodland Road Bridge over Washington Mountain Brook
Lee, MA
$817,450
Bridge construction, excavation, pipe piles, steel cofferdams, control of water, concrete tremie seal, precast box beam bridge, utilities.
Route 1 Bridge over Route 140
Foxboro, MA
$2,400,000
Bridge Demo/Reconstruction, piles and lagging, control of water,  precast retaining walls.
Route 1 over Conrail Bridge Construction
Foxboro, MA
$400,000
Bridge Construction, piles and lagging, precast retaining walls, control of water, temporary bridge with access roadway.
Route 12 Tranmissions Water Mains
Groton, CT
$913,000
Transmission water main with Meter/Valve structure, highway reconstruction. Temporary bridge with access roadway.
Effluent Line Stony Brook Treatment Plant
Norwich, CT
$421,353
6" force main, rock excavation, clearing, access road construction and roadway reconstruction.
Windham Avenue Water Line Extension
Colchester, CT
$61,000
8"&12" water mains, clearing, access road construction, state highway pavement, pavement restoration.
Indian River Flood Relief Project
Norwalk, CT
$520,000
Drainage, Box Culvert, Bridge, Flood Control, Concrete, Cast-In-Place structures.
Byram Road, Indian Field Road Bridges
Over Metro North Greenwich, CT
$50,000
Water main on bridge over metro North Railroad
Water Street Reconstruction
Norwalk, CT
$500,000
Water, Sewer, Drain, Roadway
Leadmine Road Bridge Rehabilitation
Sturbridge, MA
$88,756
Bridge deck rehabilitation, bridge rail replacement
Bridge Replacement - Graniteville Road/ 
River Street Over B&M Railroad Westford, MA
$886,688
Temporary bridge removal and bridge recon, 42" caissons, concrete work, road, utility recon.